Structured Team Training Blocks
Programming runs in defined 4- to 12-week blocks with a clear start, progression, and endpoint, rather than open-ended sessions with no real plan behind them. This structure is what separates genuine team development from a series of disconnected workouts.
Each block is designed with a specific beginning, a progressive middle, and a clear endpoint tied to testing and season timing.
Defined Block Length
Blocks run a specific 4 to 12 week duration, chosen based on the team's season timing and goals.
Progressive Structure
Each week builds on the last, following real periodization principles rather than repeating the same workout.
Clear Endpoint
Every block has a defined conclusion, typically tied to post-testing and a transition to the next phase.
Season-Aligned Timing
Block timing is chosen specifically to align with off-season, pre-season, or in-season team needs.
Find Training in Your City
Browse all 88 LA County cities and dedicated training venues we cover.
Frequently Asked Questions
How long is a typical block?
Most team blocks run 4 to 12 weeks, timed around a team's season, off-season, or pre-season window.
What happens between blocks?
Teams can continue with a maintenance program or take a planned break before the next structured block begins.
Can block length be customized?
Yes, block length is determined based on your team's specific season timeline and goals.
Do blocks include testing?
Yes, every block opens and closes with performance testing to measure real, team-wide progress.
